The short version
Replacing a worn or damaged dock leveller in Montrose? We remove the old unit, check and repair the pit, then install and commission a new hydraulic leveller with toe guards, velocity fuse and controls.
- Town
- Montrose
- Postcode district
- DD10
- Area
- Angus and Dundee
- Survey
- Free for new installations
What we fit in Montrose
- Telescopic lips. A sliding lip that reaches further and lands exactly where the driver needs it.
- Velocity fuse. If pressure is lost suddenly, the platform locks instead of dropping.
- Swing-lip levellers. Hinged lips that flip out and land on the trailer bed, suited to most loading bays.
- Door interlocks. Linking the leveller and door controls prevents either one being used out of sequence.
- Toe guards. Guards along each side keep feet out from under the moving platform.
What this work can involve
- Sizing a longer leveller platform for a bay that receives both low-bed vans and high-bed articulated trailers.
- Fitting an edge-of-dock leveller to a lightly used bay where a full leveller pit is not needed.
- Interlocking new hydraulic levellers with sectional dock doors so neither can be used out of sequence.
What the law expects at a loading bay
Across Great Britain, including Montrose, loading bays bring together several duties: maintained work equipment under PUWER 1998, safe traffic routes under the Workplace Regulations 1992, and safe powered doors under the Supply of Machinery (Safety) Regulations 2008. Dock levellers should meet BS EN 1398, and the site's risk assessment should cover vehicle creep and drive-aways.
Keeping your site running during the work
Downtime matters on a working site, so the programme is set around your shifts. For a single door the opening is usually needed for a day; multi-door jobs are done one bay at a time so deliveries keep moving.
Guide prices for dock levellers
| Item | Guide price (ex VAT) |
|---|---|
| Dock leveller, hydraulic swing-lip, into prepared pit | £6,495 – £10,995 |
| Dock leveller, telescopic lip | £8,495 – £13,995 |
Guide prices for supply and installation unless stated, excluding VAT, which is added at the current rate where it applies. Your fixed price is confirmed in writing after a survey, before any work starts.
Frequently asked questions
How long does it take to fit a dock leveller in Montrose?
A single leveller into a prepared pit is typically fitted and commissioned in a day. Pit repairs or modifications can add time, and we plan work around your loading schedule, bay by bay.
Can you replace the dock leveller at our Montrose warehouse using the existing pit?
Usually, yes. We measure the pit on survey and allow for any cutting, repair or re-edging needed. If the new unit is a different size, the quote covers the pit modifications as a separate line.
Can our dock leveller in Montrose be interlocked with the door?
Yes. We fit interlocks so the leveller only operates with the door fully open, and the door cannot close while the leveller is deployed. It suits both new and existing bays, subject to the controls on each.
Dock levellers near Montrose
Working in Montrose? We also take on jobs in Arbroath, Forfar, Stonehaven and across Angus and Dundee.
- Dock levellers in Arbroath
- Dock levellers in Forfar
- Dock levellers in Stonehaven
- Dock levellers in Dundee
- Dock levellers in St Andrews
- Dock levellers in Aberdeen
Other services in Montrose
- Hangar and large-span doors
- Fire shutters
- Door safety upgrades
- Insulated roller shutter doors
- Steel personnel and fire exit doors
- Industrial door motor replacement
- Sectional overhead doors
- Door automation and controls
More about Dock levellers · industrial doors in Montrose. Last updated 19 October 2026.
