Quick answer
Replacing a worn or damaged dock leveller in Eastleigh? We remove the old unit, check and repair the pit, then install and commission a new hydraulic leveller with toe guards, velocity fuse and controls.
- Town
- Eastleigh
- Postcode district
- SO50
- Area
- Hampshire
- Survey
- Free for new installations
Options that matter on site
- Swing-lip levellers. Robust hinged-lip levellers for standard trailer traffic.
- Sized to your fleet. We size the platform for your bed-height range and heaviest laden truck.
- Pit work. Existing pits repaired or re-edged; new pits detailed for groundworks.
- Commissioning. Each leveller tested and handed over with records and instructions.
- Telescopic lips. A sliding lip that reaches further and lands exactly where the driver needs it.
What this work can involve
- Replacing a mechanical leveller with a hydraulic unit that has single-button automatic operation and a velocity fuse.
- Fitting an edge-of-dock leveller to a lightly used bay where a full leveller pit is not needed.
- Sizing a longer leveller platform for a bay that receives both low-bed vans and high-bed articulated trailers.
What the law expects at a loading bay
Across Great Britain, including Eastleigh, loading bays bring together several duties: maintained work equipment under PUWER 1998, safe traffic routes under the Workplace Regulations 1992, and safe powered doors under the Supply of Machinery (Safety) Regulations 2008. Dock levellers should meet BS EN 1398, and the site's risk assessment should cover vehicle creep and drive-aways.
Access, phasing and timing
Sites in and around Eastleigh vary from tight trade counters to large distribution yards. The survey records access for our vehicle and platform, overhead obstructions and floor condition so the installation day runs without surprises.
Budgeting for dock levellers in Eastleigh
| Item | Guide price (ex VAT) |
|---|---|
| Dock leveller, hydraulic swing-lip, into prepared pit | £6,495 – £10,995 |
| Dock leveller, telescopic lip | £8,495 – £13,995 |
Guide prices for supply and installation unless stated, excluding VAT, which is added at the current rate where it applies. Your fixed price is confirmed in writing after a survey, before any work starts.
Frequently asked questions
How long does it take to fit a dock leveller in Eastleigh?
A single leveller into a prepared pit is typically fitted and commissioned in a day. Pit repairs or modifications can add time, and we plan work around your loading schedule, bay by bay.
Do you service and repair dock levellers across Hampshire?
Yes. We service and repair most makes of dock leveller across Hampshire, including hydraulic power packs, cylinders, hoses, lips, hinges and controls. Service and repair visits are chargeable and priced before work starts.
Can you replace the dock leveller at our Eastleigh warehouse using the existing pit?
Usually, yes. We measure the pit on survey and allow for any cutting, repair or re-edging needed. If the new unit is a different size, the quote covers the pit modifications as a separate line.
Dock levellers near Eastleigh
Besides Eastleigh, we can survey and quote for sites in Southampton, Winchester, Totton and the rest of Hampshire.
- Dock levellers in Southampton
- Dock levellers in Winchester
- Dock levellers in Totton
- Dock levellers in Hythe
- Dock levellers in Fareham
- Dock levellers in Cowes
Other services in Eastleigh
- Industrial door installation
- Impact traffic doors
- High-speed doors
- Industrial door repairs
- Industrial door replacement
- Door automation and controls
- Dock leveller and loading bay repairs
- Steel personnel and fire exit doors
More about Dock levellers · industrial doors in Eastleigh. Last updated 19 October 2026.
