Quick answer
We can supply and fit steel sliding and bi-folding doors in Barnet and across Greater London, manual or electric, with insulated or single-skin leaves and wicket doors wherever staff need everyday access.
- Town
- Barnet
- Postcode district
- EN5
- Area
- Greater London
- Survey
- Free for new installations
What to specify
- Insulated options. Insulated panel infill and edge seals for heated buildings.
- Robust build. Steel-framed leaves with steel, panel or timber cladding.
- Folding leaves. Bi-folding leaves stack neatly where side wall space is limited.
- Top-hung or bottom-rolling. We hang the door from above or run it on a floor rail depending on what the building can support.
- Wide spans. Openings of almost any width split into as many leaves as needed.
Typical scopes of work
- Replacing a damaged floor rail and guide wheels on a bottom-rolling door struck by a vehicle.
- Fitting bi-folding doors to a maintenance workshop where overhead gantry cranes rule out a roller shutter or sectional door.
- Installing telescopic sliding doors where the wall space to one side is limited by an adjoining structure.
Who is responsible for door safety at a site in Barnet?
In England, two sets of duties meet at a powered door. The installer who supplies or motorises it must hand over a door that meets the Supply of Machinery (Safety) Regulations 2008, tested against BS EN 12453 and documented. The business in control of the premises must then maintain it: regulation 5 of the Workplace Regulations 1992 covers maintenance, and regulation 18 requires upward-opening doors to have a device that stops them falling back and powered doors to have features that prevent trapping.
Planning the work around your site
Most installations in Barnet can be phased so part of the site keeps working. We agree access routes, exclusion zones and any temporary security with you before the team arrives, and can work early mornings, evenings or weekends where the business needs it.
Budgeting for sliding and folding industrial doors in Barnet
| Item | Guide price (ex VAT) |
|---|---|
| Sliding / folding industrial doors | £5,995 – £24,995 |
| Strip-out and disposal on replacement | £345 – £1,195 per door |
Guide prices for supply and installation unless stated, excluding VAT, which is added at the current rate where it applies. Your fixed price is confirmed in writing after a survey, before any work starts.
Questions from businesses in Barnet
Can our existing sliding doors in Barnet be motorised?
Often, if the leaves and track are in good condition. We assess the doors, fit a drive and the safety devices needed, and take on the conformity responsibilities that come with converting a manual door to power.
Will a sliding door fit our building in Barnet?
It needs wall space to the side for the leaves to slide past, or room for folded leaves to stack. We measure this on survey and choose between sliding, telescopic and folding layouts to suit what is there.
Which is better for our Barnet site, top-hung or bottom-rolling?
Top-hung keeps the floor flush but needs a strong structure overhead. Bottom-rolling suits lighter buildings but needs a clean, protected floor rail. We recommend one after checking both on survey.
Sliding and folding industrial doors near Barnet
Our teams cover Barnet (EN5) and nearby Potters Bar, Borehamwood, Finchley, along with the rest of Greater London.
- Sliding and folding industrial doors in Potters Bar
- Sliding and folding industrial doors in Borehamwood
- Sliding and folding industrial doors in Finchley
- Sliding and folding industrial doors in Muswell Hill
- Sliding and folding industrial doors in Enfield
- Sliding and folding industrial doors in Wood Green
Other services in Barnet
- Planned maintenance contracts
- Fire shutters
- Fire shutter servicing and drop tests
- Industrial door replacement
- Door automation and controls
- Dock leveller and loading bay repairs
- Industrial roller shutters
- Dock shelters and seals
More about Sliding and folding industrial doors · industrial doors in Barnet. Last updated 19 October 2026.
