At a glance
New-build loading docks in Woking need levellers planned early. We provide pit details for the groundworks contractor, then fit and commission the levellers and interlock them with the dock doors once those are in.
- Town
- Woking
- Postcode district
- GU22
- Area
- Surrey
- Survey
- Free for new installations
Options that matter on site
- Telescopic lips. A sliding lip that reaches further and lands exactly where the driver needs it.
- Door interlocks. Linking the leveller and door controls prevents either one being used out of sequence.
- Toe guards. Side guards stop feet being trapped as the platform lowers.
- Swing-lip levellers. Robust hinged-lip levellers for standard trailer traffic.
- Sized to your fleet. Platform length and capacity chosen for your vehicles and forklifts.
Typical scopes of work
- Sizing a longer leveller platform for a bay that receives both low-bed vans and high-bed articulated trailers.
- Supplying box-frame levellers to a groundworks contractor for casting into a new-build dock edge.
- Replacing a mechanical leveller with a hydraulic unit that has single-button automatic operation and a velocity fuse.
What the law expects at a loading bay
Across Great Britain, including Woking, loading bays bring together several duties: maintained work equipment under PUWER 1998, safe traffic routes under the Workplace Regulations 1992, and safe powered doors under the Supply of Machinery (Safety) Regulations 2008. Dock levellers should meet BS EN 1398, and the site's risk assessment should cover vehicle creep and drive-aways.
How the work is organised
For busy sites in Surrey the work can be split across visits — preparation and framing first, door installation and commissioning second — so the opening is only out of action for the shortest time.
Budgeting for dock levellers in Woking
| Item | Guide price (ex VAT) |
|---|---|
| Dock leveller, hydraulic swing-lip, into prepared pit | £6,495 – £10,995 |
| Dock leveller, telescopic lip | £8,495 – £13,995 |
Guide prices for supply and installation unless stated, excluding VAT, which is added at the current rate where it applies. Your fixed price is confirmed in writing after a survey, before any work starts.
Frequently asked questions
How much is a dock leveller in Woking?
Our guide price is £6,495 to £10,995 ex VAT for a hydraulic swing-lip leveller into a prepared pit, and £8,495 to £13,995 for telescopic lip. Your fixed price in Woking, including any pit work, is confirmed in writing after a free survey.
Can you replace the dock leveller at our Woking warehouse using the existing pit?
Usually, yes. We measure the pit on survey and allow for any cutting, repair or re-edging needed. If the new unit is a different size, the quote covers the pit modifications as a separate line.
How long does it take to fit a dock leveller in Woking?
A single leveller into a prepared pit is typically fitted and commissioned in a day. Pit repairs or modifications can add time, and we plan work around your loading schedule, bay by bay.
Dock levellers near Woking
Woking is in the GU22 postcode district in Surrey. We also cover Guildford, Egham, Walton-on-Thames.
- Dock levellers in Guildford
- Dock levellers in Egham
- Dock levellers in Walton-on-Thames
- Dock levellers in Camberley
- Dock levellers in Staines-upon-Thames
- Dock levellers in Sunbury-on-Thames
Other services in Woking
- Planned maintenance contracts
- PVC strip curtains
- Dock shelters and seals
- Complete loading bays
- Sliding and folding industrial doors
- Industrial door motor replacement
- Bollards and door protection
- Fire shutters
More about Dock levellers · industrial doors in Woking. Last updated 19 October 2026.