Quick answer
Dock shelters and seals for loading bays at warehouses, food sites and distribution centres in Woking. We size each shelter to your dock and fleet, then fit it to close the gap around the trailer.
- Town
- Woking
- Postcode district
- GU22
- Area
- Surrey
- Survey
- Free for new installations
Options that matter on site
- Sized to your fleet. We size curtains to the vans, rigids and trailers that actually use your bay.
- Guidance aids. Guide stripes, wheel guides and lights help drivers park centrally.
- Replacement curtains. Worn or torn curtains renewed on the existing frame.
- Weather protection. Goods and staff stay out of the weather while the trailer is being worked.
- Temperature control. Less heated or chilled air escapes around the trailer while the door is up.
What this work can involve
- Adding rain gutters and guide lights to dock shelters so water stays out of trailers during loading.
- Replacing worn dock bumpers before fitting new shelters so trailers stop at the correct distance from the wall.
- Specifying deeper top curtains for bays that receive double-deck trailers alongside standard trailers.
Who is responsible for loading bay equipment at a site in Woking?
The employer or occupier is. PUWER 1998 requires work equipment to be maintained and inspected, and the Workplace Regulations 1992 cover vehicle and pedestrian routes around the dock. In practice that means planned servicing of levellers and doors, daily pre-use checks and a clear procedure to stop trailers moving during loading.
Access, phasing and timing
Before work starts we send a method statement and risk assessment, confirm who on site will be our contact and agree where materials and access equipment will go. On shared industrial estates that can mean booking yard space with the landlord.
Guide prices for dock shelters and seals
| Item | Guide price (ex VAT) |
|---|---|
| Dock shelter (retractable) | £2,195 – £5,495 |
| Inflatable dock shelter | £6,495 – £11,995 |
Guide prices for supply and installation unless stated, excluding VAT, which is added at the current rate where it applies. Your fixed price is confirmed in writing after a survey, before any work starts.
Dock shelters and seals in Woking: your questions
How long does dock shelter installation take in Woking?
Typically half a day to a day per shelter, depending on size and fixings. We schedule work bay by bay so loading can continue at the others while each shelter is fitted.
Do you repair dock shelters in Woking?
Yes. We straighten or replace bent frames and arms, replace curtains, repair inflatable shelter blowers and bags, and renew bumpers. Repair visits are chargeable, and we quote before ordering any made-to-measure parts.
Do you fit dock shelters for cold stores around Surrey?
Yes. We fit inflatable and retractable shelters at cold stores and chilled sites across Surrey, often alongside insulated doors and levellers, to help hold temperature and limit condensation at the dock while trailers are worked.
Dock shelters and seals near Woking
Besides Woking, we can survey and quote for sites in Guildford, Egham, Walton-on-Thames and the rest of Surrey.
- Dock shelters and seals in Guildford
- Dock shelters and seals in Egham
- Dock shelters and seals in Walton-on-Thames
- Dock shelters and seals in Camberley
- Dock shelters and seals in Staines-upon-Thames
- Dock shelters and seals in Sunbury-on-Thames
Other services in Woking
- Planned maintenance contracts
- Industrial door motor replacement
- Fire shutter servicing and drop tests
- Door automation and controls
- Door safety upgrades
- Insulated roller shutter doors
- Industrial door replacement
- Dock levellers
More about Dock shelters and seals · industrial doors in Woking. Last updated 19 October 2026.
